Highway 101 Gap Closure

Highway 101 HOV Gap Closure Project

The Highway 101 HOV Gap Closure Project provides continuous carpool lanes in both directions from Lucky Drive in Corte Madera to the south of North San Pedro Road in San Rafael.

The HOV Gap Closure project completion ceremony was held on March 11, 2011. Completion of this project closed a 4.5 mile gap in the HOV lane system in Marin County from Richardson Bay Bridge to Route 37, providing 17 miles of continuous carpool lane in both the northbound and southbound direction. The completion of this project provides a substantial reduction in the delay during commute hours. The southbound morning commute delay in the carpool lane reduced by 77% (from 22 minutes to 5 minutes) and 72% in other lanes (from 29 minutes to 9 minutes). The northbound afternoon commute delay in the carpool lane reduced by 73% (from 5.5 minutes to 1.5 minutes) and 50% in the other lanes (from 12 minutes to 6 minutes). The congested time period was reduced from 4.5 hours to 2 hours in the southbound morning commute and from 4 hours to 2.5 hours in the afternoon commute time.

March 2011 Gap Closure Completion Ceremony Photo

Some of the features included in the construction of this project are as follows:

  • Constructing northbound and southbound carpool lanes in the median.
  • Construction of retaining walls as well as sound walls
  • Adding sound absorbing materials to the existing wall and incorporating sound absorbing material in new sound walls in San Rafael.
  • Relocate SMART railroad to widen freeway for carpool lanes.
  • Reconstruct two lane connector from southbound 101 to 580 eastbound.
  • Raise elevation of freeway in central San Rafael to avoid flooding in heavy rains.
  • Overlay the freeway lanes with Open Graded Asphalt Concrete (OGAC) to reduce noise for the adjoining property owners.

Funds for a landscaping and mitigation project within the Gap Closure project limits are programmed in fiscal year 2014-2015.

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Download Acrobat Reader Download WinZip Download Word Viewer Download Excel Viewer Download PowerPoint Viewer
Last updated: 10/27/2014 3:42:35 PM